MEGA TUNNEL MACHINES 

Click Source Below to Leave Review

Synopsis:

In 24 hour shifts, three tunnels are being built in parallel in different directions on the so-called intermediate attack in Stuttgart Wangen. Mostly in blasting with 50 large machines from wheel loaders to drill trucks and lots of explosives. Since the workers are here directly under the city, vibrations on the surface must be avoided.
Recommended Videos

SELL YOUR DRILLS WITH CODWELL DRILLING

Connecting with us is easy, and we're committed to swift responses for all your questions and inquiries

SELL WITH PEACE OF MIND

Connecting with us is easy,
and we're committed to swift responses
for all your questions and inquiries
CONTACT US

CODWELL DRILLING EQUIPMENT AND SERVICES – Licenced Dealer # 4720719 

© 2024 Codwell Drilling Equipment & Services. All Rights Reserved.

Shopping cart

0
image/svg+xml

No products in the cart.

×